Blog / Guides
Guides

What is OEE – and how can data improve it?

OEE shows how effectively your machines and production run. See how OEE is calculated, what a good figure is, and how data and AI can help improve it.

Jesper Gottlieb Larsen, Head of Global MarketingNovember 19, 20263 min read

Short answer

OEE (Overall Equipment Effectiveness) is a figure that shows how much of the time a machine or line could be producing actually turns into good products. It’s calculated as availability × performance × quality. 100% means the machine runs for all of its planned time, at full speed and without defects.

The three parts of OEE

  1. Availability: What share of the planned time did the machine run? Stops due to breakdowns, changeovers and waiting pull it down.
  2. Performance: Did it run at the speed it can? Small stops and slow running pull it down.
  3. Quality: How many products were good first time? Scrap and rework pull it down.

How to calculate OEE – a simple example

A machine is planned to run for 8 hours.

  • It stands still for 1 hour → availability = 7 / 8 = 87.5%
  • In those 7 hours it produces 90% of what it could at full speed → performance = 90%
  • 95% of the products are good → quality = 95%

OEE = 87.5% × 90% × 95% ≈ 75%

The example is made up to show the calculation.

What is a good OEE?

It depends on the industry and the production. The most important thing isn’t comparing yourself with others, but tracking your own figure over time and knowing which of the three parts pulls it down the most.

Why is OEE hard to measure in practice?

  • Stops are recorded by hand – or not at all.
  • Data is spread across machines, the MES system, ERP and spreadsheets.
  • Nobody has time to pull the numbers together, so they arrive too late to act on.

How data and AI can improve OEE

  • Automatic collection: Data is taken directly from the machines, so the figures are accurate and up to date.
  • One overview: OEE per machine, line and shift on one screen.
  • Causes of stops: AI can find patterns in when and why stops happen.
  • Predicting breakdowns: With sensor data you can spot signs of wear before the machine fails (predictive maintenance).
  • Better planning: Fewer changeovers and a better order sequence.

Remember: machine data isn’t always right. Check it before the AI uses it. Read more in our post When the machine talks to AI.

How BCT helps

We help manufacturers bring together data from machines, MES and ERP so OEE can be tracked and improved – and we build AI that finds the causes of stops. We’re happy to start with a Shadow Walk on the factory floor.

Read about AI and data in manufacturing →

Frequently asked questions

What does OEE stand for?

Overall Equipment Effectiveness.

How is OEE calculated?

Availability × performance × quality.

What’s the difference between OEE and MES?

OEE is a figure. MES is a system that controls and records production – and is often where OEE data comes from.

Can AI improve OEE?

Yes, especially by finding the causes of stops and predicting breakdowns – but only if the data is in order.

In short

OEE shows how much of the planned time actually turns into good products. The figure combines three things: whether the machine is running, how fast it runs, and how many products are right first time.

The hard part is usually not the formula but getting reliable data on stops, speed and scrap. Start with one line, collect data automatically, and use the figures to find the biggest losses before you go further.

Jesper Gottlieb Larsen
Written byJesper Gottlieb LarsenHead of Global Marketing

Questions, or want to know what this could mean for you? Email me directly or give us a call.

Want to see what it could look like for you?

We are happy to have a no-obligation talk about your day-to-day work and where AI and software can make a difference.

Contact us   Read about Shadow Walk

Black Capital Technology logo
The most human AI company in the world.
Born digital. Built different.
Contact
info@blackcapitaltechnology.com
Dansk flag. Dannebro
Mølleå 3-5,
9000 Aalborg
Denmark
(+45) 39 39 42 43
CVR:
DK-42380784
Norsk flag
Tordenskiolds gate 2,
0160 Oslo
Norway
(+47) 907 00 863
Org. nr.:
NO-933435458